Testing Set Up for Testing of Energy Meters for error due to DC Component in AC Current Circuit(IS : 13779 – 1999, Clause 11.2)

Lab Test Routine Test

The set up is designed to carry out the test as per IS : 13779 – 1999, Clause 11.2, for DC Components in AC Current Circuit. For balancing the Circuit Meter similar to ( identical ) to Meter Under Test is used and Swamping Load is used for better accuracy.

Products from same category

Short-time Overcurrent Test Equipment is used to measure and analyze the influence of short-time overcurrents on energy meter.
Short Time Over Current Tester
The test kit is used to test the influence of supply dip on energy meter, after which the meter is tested for usual tests and the results are compared with previous one
Influence of Supply Voltage
The Glow Wire Test Apparatus is designed with goal of improved repeatability of test results and ease of operation
Glow Wire Test Apparatus GWT A2
5. Short Circuit Test Setup per IS 15884.png
Short Circuit Test Setup for Prepayment Energy Meters as per IS 15884, 2010